1 / 1
About this project
At the customer's request, we fabricated and welded a stair structure. The structure is fully boltable, as it had to be mounted at height without the possibility of welding on site. After production, the entire structure was hot-dip galvanised for optimal protection. The stair structure was then pre-assembled and delivered directly to the customer for smooth and efficient installation.
Project details
Sector
Platforms
Year
2024
Execution
Zupor BV
Location
België